Installation Guide
Follow these steps to install your Syurelife lighting safely and correctly the first time.
Safety First
- Turn off power at the circuit breaker before any electrical work.
- Read the instruction manual included with your product before starting.
- Use only UL-listed power supplies and connectors.
- Keep lights away from water and heat sources unless the product is specifically rated for them.
- Do not install while the lights are connected to power.
Tools You May Need
- Screwdriver
- Measuring tape
- Level
- Mounting clips or double-sided tape (included with most kits)
Step-by-Step
- Plan your layout. Measure the area and mark where each light or strip will go. Dry-fit before mounting.
- Prepare the surface. Clean and fully dry the mounting surface so adhesives and clips hold firmly.
- Mount the lights. Attach clips or peel-and-stick backing, pressing firmly for 10 seconds.
- Connect power. Plug into the included adapter, keeping connections away from moisture.
- Test everything. Power on and confirm every section lights up before tidying cables.
Pro Tips
- For LED strips, cut only at the marked cut lines.
- Avoid sharp bends that can damage the circuit.
- For outdoor installs, seal connections with heat-shrink tubing or waterproof tape.
Need Help?
Watch our video guides or contact Product Support if you get stuck.
